Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2854

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/output.class.php on line 3708

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/themes/jupiter/framework/includes/minify/src/Minifier.php on line 227
Southern Avenue and Meridian Road Drainage Improvements - Premier Engineering Corporation

Southern Avenue and Meridian Road

Drainage Improvements | Maricopa County, AZ

Drainage/Flood Control

Premier performed a drainage evaluation and subsequent design to mitigate off-site flows impacting a low point in Meridian Road immediately north of the Southern Avenue and Meridian Road intersection. Services included evaluating alternatives and designing approximately 700 feet of roadway and 1,000 feet of drainage channel. An initial drainage report was prepared which outlined various alternatives to route off-site flows under and away from the intersection improvements. Premier was then contracted to prepare the plans, specifications and estimates for the chosen alternative.