Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2854

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/output.class.php on line 3708

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/themes/jupiter/framework/includes/minify/src/Minifier.php on line 227
Sky Harbor International Airport Terminal 3 Southeast Transition Apron and Taxiway D Segment Reconstruction - Premier Engineering Corporation

Terminal 3 Southeast Transition Apron and Taxiway D Segment Reconstruction

Sky Harbor International Airport | Phoenix, AZ

Aviation 

Premier performed quality control materials testing services. The Terminal 3 Southeast Transition Apron area is located south of the Terminal 3 South concourse and west of Taxiway T and the Taxiway D segment is located between the D8 and D9 connectors and south of the Terminal 3 South concourse. Originally the Transition Apron area was paved with asphalt concrete and the Taxiway D segment was paved with Portland Cement Concrete Pavement (PCCP). Both pavements reached useful lives and required reconstruction with PCCP.