Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2854

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/output.class.php on line 3708

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/themes/jupiter/framework/includes/minify/src/Minifier.php on line 227
Pusch View Lane Extension Bridge - Premier Engineering Corporation

Pusch View Lane Extension Bridge

Town of Oro Valley, AZ

Structural

The extension of Pusch View Lane to Lambert Lane required construction of a new bridge over Canyon Del Oro Wash. Premier completed the plans, specifications and estimates for the construction of the new bridge to carry four lanes of traffic and a raised median with decorative pavers and sidewalks over the wash. The new bridge consisted of a six-span AASHTO girder superstructure with a total length of about 800-feet. This horizontally curved bridge with an out-to-out width of 89’-6” provided considerable geometric challenges during design and construction. The abutments and piers are supported by four-foot and six-foot diameter concrete drilled shafts, respectively.