Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2854

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/output.class.php on line 3708

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/themes/jupiter/framework/includes/minify/src/Minifier.php on line 227
Missouri Avenue Watermain Extension - Premier Engineering Corporation

Missouri Avenue Watermain Extension

Phoenix, AZ

Water/Wastewater

Premier was tasked with design and construction of 1,300 LF of an 8-inch water main in Missouri Avenue from 45th Avenue to Grand Avenue as well as repairs to an existing 16-inch butterfly valve on the west side of Grand Avenue within the Burlington Northern Santa Fe Railroad Company (BNSF) property. Our scope of design services included topographic field survey, waterline design, data collection, preparation of base file, utility coordination/test hole services, waterline plans, MCESD review/permitting, and ADOT encroachment permitting.

…strong communication skills and attention to detail really stand out.