Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2854

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/output.class.php on line 3708

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/themes/jupiter/framework/includes/minify/src/Minifier.php on line 227
Honeywell Tempe Pavement Study - Premier Engineering Corporation

Honeywell Tempe Pavement Study

Tempe, AZ

Geotechnical

Premier provided pavement and geotechnical engineering services for the thickness design, maintenance and management of existing and future pavement. Scope included pavement assessments, pavement layer thickness and subgrade soil testing for further evaluation of the deteriorated pavement, as well as analysis of the specified pavement sections using a pavement management program to identify immediate and long-term maintenance and rehabilitation treatments.