Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2854

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/output.class.php on line 3708

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/themes/jupiter/framework/includes/minify/src/Minifier.php on line 227
First Baptist Church - Premier Engineering Corporation

First Baptist Church

Chandler, AZ

Land Development

The Chandler First Baptist Church is located on a 32-acre partially developed site with a building, surface parking lot, drainage facilities, and landscape and hardscape improvements. The expansion project included a new 25,000 square feet, two-story building with potential for future expansion and adding up to 100 surface parking stalls. Premier provided civil engineering and land surveying services including topographic survey, storm water management, on-site grading & drainage, paving and horizontal control, water, sewer and fire line design, drainage report, cost estimating and post-design services.