Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2854

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/output.class.php on line 3708

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/themes/jupiter/framework/includes/minify/src/Minifier.php on line 227
Chandler Public Safety Facility - Premier Engineering Corporation

Chandler Public Safety Facility

Chandler, AZ

Geotechnical

The City of Chandler planned to develop the Chandler Public Safety Training Center on an approximately 8.5-acre site with several buildings, parking lots, driveways, fire truck staging areas, props areas, and retention basins. Premier’s scope included geotechnical field exploration, field testing, laboratory testing, and geotechnical analysis to determine subsurface conditions and provide recommendations for design and construction.