Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2854

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/plugins/revslider/includes/output.class.php on line 3708

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c07/h03/mnt/113067/domains/pre-engr.com/html/wp-content/themes/jupiter/framework/includes/minify/src/Minifier.php on line 227
Cataract Lake Road and Parks Tenant Improvements, 1-40 Geotechnical Evaluation - Premier Engineering Corporation

Cataract Lake Road and Parks Tenant Improvements

1-40 Geotechnical Evaluation | AZ

Geotechnical

Premier provided coordination services and a driller to perform 23 pavement cores (8” diameter minimum), laboratory testing, and traffic control for Arizona Department of Transportation (ADOT). We provided asphalt concrete coring, soil drilling/boring, and laboratory soil testing services, and completed 63 moisture tests, 21 sieve analyses, 21 plasticity index tests and 7 R-value tests on composite soil (bulk) samples.