Sky Harbor International Airport Terminal 3 Southeast Transition Apron and Taxiway D Segment Reconstruction - Premier Engineering Corporation

Terminal 3 Southeast Transition Apron and Taxiway D Segment Reconstruction

Sky Harbor International Airport | Phoenix, AZ

Aviation 

Premier performed quality control materials testing services. The Terminal 3 Southeast Transition Apron area is located south of the Terminal 3 South concourse and west of Taxiway T and the Taxiway D segment is located between the D8 and D9 connectors and south of the Terminal 3 South concourse. Originally the Transition Apron area was paved with asphalt concrete and the Taxiway D segment was paved with Portland Cement Concrete Pavement (PCCP). Both pavements reached useful lives and required reconstruction with PCCP.