38th Street Waterline Extension - Premier Engineering Corporation

38th Street Waterline Extension

Phoenix, AZ

Water/Wastewater

The 38th Street Extension project provided a street connection between Washington and Van Buren Streets to allow bus routes to connect to the 38th Street/Washington Light Rail Transit Park-and-Ride facility. Premier provided local roadway and waterline design through an on-call contract. Waterline design included approximately 580 feet of 12-inch ductile iron pipe waterline and one fire hydrant assembly installation, which looped the existing waterline systems in Van Buren and Washington Streets as required by the City’s Water Department. We also prepared additional required documentation for review and approval from Maricopa County Environmental Services Department (MCESD) including water design reports, MCESD application, and plan submittal.